Procedure and Comprehensive List - Approval for Boiler Manufacturer and Renewal Thereof

1. Standard Inspection Procedure

Click HERE to view / download the Office Order of the Updated Standard Inspection Procedure

1) Scrutiny of Submitted Documents.

2) Inspection of Premises, Verification of Manpower along with their Experience and Machineries.

3) Submission of Report

4) Technical Discussion.

5) Issuance of Certificate.

2. Standard Operating Procedure

Click HERE to view / download the Office Order of the Updated Standard Operating Procedure

1) Submission of application in Standard Format.

2) Inspection of Premises, Verification of Manpower along with their Experience and Machineries.

3) Report Submission to the Director through online.

4) Issue of Approval Letter by Director after necessary interaction.

3. Checklist

Click HERE to view / download the Office Order of the Updated Checklist

1) Forwarding Letter by the applicant.

2) Online Application to Director along with duly filled Form in prescribed format.

3) Copy of Trade License, Lease Deed (if applicable), Tenancy Deed (if applicable), Photo Identity Proof.

4) List of Machineries as mentioned in the Form.

5) List of Technical Personnel along with experience.

6) All documents in Sl No. 1 and 3 to 6 above are to be uploaded through online.

4. PROCESS FLOW

Click HERE to view / download the flow of Manufacturer of Boiler service

5. Timeline

Click HERE to view / download the timeline for the delivery of different services of Directorate of Boilers (GoWB) - Part 2

Sl. No. Services Designated Officer Stipulated Time Limit Appellate Officer Reviewing Officer
Designation Stipulated Time Limit Designation Stipulated Time Limit
5. Issuance of Certificate of Boilers/Economiser, their components, etc. during manufacturing. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
6. Examination and approval of Drawings. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 45days after submission of complete authentic drawings, documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
7. Change of Ownership of Boilers/Economiser. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 60days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
8. Approval of Repairer/Erectors/MAnufacturer of Boiler and Pipe Line/Endorsement of Repairer/Erectors of Boiler and Pipe Line. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
9. Registration Of Steam and Feed Pipe Lines. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
10. Testing of Materials at Testing Laboratory. Inspecting Officer/Superintendent of testing laboratory. 7days after completion of testing. Joint Director of Boilers 45Days Director of Boilers 60Days
11. Issuance of Erection Certificate of Boilers/Economiser. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after completion of hydraulic test of Boilers/Econamiser. Joint Director of Boilers 45Days Director of Boilers 60Days

6. USER MANUAL

  • • Click HERE to view / download the user manual of approval of certificate for Recognition of Manufacturer
  • • Click HERE to view / download the user manual of approval of certificate for Renewal of Manufacturer