Procedure and Comprehensive List - Approval for Boiler Erector / Repairer and Renewal Thereof

Standard Inspection Procedure

a) Scrutiny of Submitted Documents.

b) Inspection of Premises, Verification of Manpower along with their Experience and Machineries.

c) Submission of Report

d) Technical Discussion.

e) Issuance of Certificate.

Standard Operating Procedure

1) Submission of Application in standard format (FORM - XVIII as per IBR).

2) Submission of requisite fees in the head of accounts : "0230-00-103-001-14"- Service fees (14) online through www.wbboilers.gov.in portal.

3) Inspection of machineries available as per submitted doucuments, premises at the given address.

4) Verification of Technical Personnel as per submitted list and their experience.

5) Submission of report to the Director.

6) Issue of Approval Letter

Checklist

1) Forwarding Letter by the applicant.

2) Application to Director along with duly filled Form in prescribed format.

3) Requisite fees for approval.

4) Copy of Trade License, Lease Deed (if applicable), Tenancy Deed (if applicable), Photo Identity Proof etc.

5) List of Machineries as mentioned in the Form.

6) List of Technical Personnel along with experience.

Timeline

Sl. No. Services Designated Officer Stipulated Time Limit Appellate Officer Reviewing Officer
Designation Stipulated Time Limit Designation Stipulated Time Limit
5. Issuance of Certificate of Boilers/Economiser, their components, etc. during manufacturing. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
6. Examination and approval of Drawings. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 45days after submission of complete authentic drawings, documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
7. Change of Ownership of Boilers/Economiser. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 60days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
8. Approval of Repairer/Erectors/MAnufacturer of Boiler and Pipe Line/Endorsement of Repairer/Erectors of Boiler and Pipe Line. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
9. Registration Of Steam and Feed Pipe Lines. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after submission of complete authentic documents and fees. Joint Director of Boilers 45Days Director of Boilers 60Days
10. Testing of Materials at Testing Laboratory. Inspecting Officer/Superintendent of testing laboratory. 7days after completion of testing. Joint Director of Boilers 45Days Director of Boilers 60Days
11. Issuance of Erection Certificate of Boilers/Economiser. Assistant Director of Boilers/Dy.Director of Boilers as applicable. 30days after completion of hydraulic test of Boilers/Econamiser. Joint Director of Boilers 45Days Director of Boilers 60Days

Click HERE to view / download the timeline for the delivery of different services of Directorate of Boilers (GoWB) - Part 2

USER MANUAL

  • • Click HERE to view / download the user manual of approval of certificate for Recognition of Erector / Repairer
  • • Click HERE to view / download the user manual of approval of certificate for Renewal of Erector / Repairer
  • • Click HERE to view / download the user manual of approval of certificate for Endorsement of Erector / Repairer

©Copyright 2015 - 2016 Directorate of Boilers - All Rights Reserved